Living Life In A Wheelchair

Home | Blog

Progress On My Yard Drainage Project
[ Tuesday August 25th 2020 at 8:55 pm ]

Two of the youth spent roughly 2 hours helping me this evening. The landscape fabric is in place in the center area around the concrete yard drain. Then the initial two wheel barrow loads of drainage gravel were added. This means the end of the project is in sight.

One of the young adults who came to help me this evening put in a lot of time in fall 2019 digging the center area out. He asked me if I would leave the drainage gravel for him to load for the center area. I can appreciate this request and have agreed to do so. He worked very hard during the digging. This isn't to mention the 2½ cubic yards of rocks he removed while digging.