Foundation Sealer Touch Ups Completed
[ Saturday August 22nd 2020 at 4:18 pm ]
The final step for the foundation sealer being applied to the outside of my concrete yard drain is done. The foundation sealer still needed to be applied around the water inlets. These touch ups were caused by the pieces of tape covering the ends of the water inlets while the foundation sealer was rolled onto the concrete yard drain; I didn't want foundation sealer to get into the pieces of ½" PVC conduit. It is great having this step done. The foundation sealer needs a few days to cure. Then it will be time to start loading the drainage gravel into the hole around the concrete yard drain. The process is coming along. I have confidence that this will be place for the coming winter.